• Operation & Maintenance of 12 Package treatment plants at all the GASCO sites
• Treatment to meet ADNOC COP limits for re-use of treated water for irrigation.
• At Habshan site we extended this to use of dry sludge for fertilizer as well.
Location:
Habshan, Buhasa & Asab, Abu Dhabi
Plant Type:
Sewage Treatment Plants
Capacity:
200 – 900 m3/day
Future Capacity:
For future networks
Use:
Disinfection of distributed water for Abu Dhabi Emirate.
Client:
GASCO (ANDOC GAS PROCESSING)
End User:
GASCO (ANDOC GAS PROCESSING)
Contract Type:
Operation & Maintenance
• Brought back all operations to meet ADNOC COP limits and consistently maintain this from 2012 to date.
• Largely minimized usage of supplied potable water for irrigation.