SITE
Menu
Menu
Call

Operation & Maintenance of Sewage Treating Plants at ADCO's Fields & Terminal

Scope of Work:

• Operation & Maintenance of 16 Package treatment plants at all the ADCO sites

• Treatment to meet ADNOC COP limits for re-use of treated water for irrigation.

Key Data

Location:

Onshore Oilffields - Abu Dhabi

Plant Type:

Sewage Treatment Plants

Capacity:

200 – 700 m3/day

Future Capacity:

Use:

Client:

ADNOC Onshore

End User:

ADNOC Onshore

Contract Type:

Operation & Maintenance

Key Benefits

  • Main benefit was complete replacement of gas chlorination systems and connected chlorine cylinder usage.
  • Complete automation integration with pumping station SCADA.
  • Salt based system with no issues of raw material.

For better web experience, please use the website in portrait mode